Manage scheduling and automate the Daily Plan reorganization based on real-time field progress, such as:
-
Task completion status.
-
Technician GPS locations.
Create a new real-time model
To create a new model:
-
Navigate to Features > Core > Daily and Multi-day Plan > Daily Plan.
-
Click the Reprocessing tab.
-
In the list of resources, select the resource you want to configure.
-
Click Configure Model.
-
In the Real-Time Scheduling Models List window, click New Model.
-
Click the General Parameters tab.
-
Enter:
-
Description: A description of the model.
-
Extended description: A detailed explanation of the model’s purpose.
-
Automatic validation: Whether to automatically validate the sequence against real-time information.
-
Active: Whether to activate the model.
-
To crystallize: Whether to crystallize the sequence for the model.
-
Default: Whether the model is the default scheduling model.
-
-
Click the Advanced Parameters tab.
-
Enter:
-
Detailed total: Whether to show the detailed total.
-
Duration prediction: Whether to show the predicted task duration.
-
Team suggestion: Whether to show the suggested team for a resource.
-
-
Click the Reprocessing Parameters tab.
-
Enter:
-
Simulation rule: The rule for the system to process and assign orders.
-
Exchange activities among resources: Whether to allow the model to switch activities between resources.
-
Additional activities: Whether to let resources schedule additional activities.
-
On duty availability: Whether a resource is considered on-duty.
-
-
Click Insert.
Add activities and skills to a model
To add new activities and skills to the activities list for the model:
-
Click Configure Model.
-
In the Real-Time Scheduling Models list window, click New Model.
-
Click the Activity tab.
-
Enter:
-
Activity: To select an activity from the drop-down menu.
-
Exchange activities among resources: To determine whether to allow the model to switch this activity between resources.
-
-
Click Add.
Add a WO and work cycle to a model
To add a WO type and work cycle to the WO / Cycle list:
-
Under the WO / Cycle type section, enter:
-
WO type: The type of WO.
-
Work cycle: The type of work cycle.
-
Exchange activities among resources: Permission to allow the model to switch activities among different resources for this work cycle.
-
-
Click Add.
Create a new model sequence
-
To view and select a new scheduling model, click New Model Sequence.
-
Enter:
-
Description: A description of the model.
-
Automatic Validation: Permission to determine if the sequence automatically validates against real-time information.
-
Active: Whether the model is active or not.
-
To crystallize: Permission to determine if the model sequence crystallizes.
-
-
Click Save.
Edit an existing model
To edit an existing scheduling model:
-
Navigate to Features > Core > Daily and Multi-day Plan > Daily Plan.
-
Click the Reprocessing tab.
-
In the resource list, select the resource you want to configure.
-
Click Configure Model.
-
In the Real-Time Scheduling Models List window, click your scheduling model.
-
In the Scheduling Model interface, edit the information.
-
Click Save.
Automate high-priority assignments
If you have urgent tasks that need immediate automated placement in a plan:
-
Navigate to one:
-
Clipboard
-
Schedulable Activities
-
Urgent
-
-
Select activities you want to assign to the real time model.
-
Navigate to the Reprocessing tab.
-
Click Assign Selected.
Note: To find the best slot, the real-time model only focuses on these interventions.
Audit and compare plan changes
To review the effects of changes in your daily plan:
-
Click Archive.
-
In the Reelaboration History window, select a row to inspect specific details:
-
Excluded Resources: View which technicians were skipped and why.
-
Plan Edits: View all confirmed, canceled, or new WOs for each resource.
-
-
To see a before-and-after of the Gantt chart, click Open processing snap-shot.
Set up automation calendars
To add a new automated cycle to the daily plan:
-
Click Processing Parameters.
-
In the Processing Parameters pop-up window, select a model from the Model drop-down menu.
-
Set these fields:
-
Day.
-
Start time.
-
End time.
-
Cyclic nature.
-
The system requires a minimum reprocessing cycle of 20 minutes.
-
-
-
Select or deselect the Automatic Validation checkbox.
-
Automatic: Sends updated schedules directly to technicians’ mobile devices.
-
Manual: A dispatcher must review changes before they are sent to the field.
-
-
Click Add.
Sync field progress
To ensure your plan reflects real-time:
-
Go to the Day Parameters section.
-
Choose an action:
-
Enable synchronization: Determine if the technician's last GPS and status synchronization updates the daily plan.
-
Set activation time: Determine if the sync is enabled only after a specific time of day.