Work Order Permits

The Permits are the documents required to manage Work Orders (WO) in the field. They can be defined as Blocker, which causes to lock the scheduling to be locked until their release.

Within the WO, there may be permits associated with the given operation or with its header. Depending on the cases, the scheduling constraints refer only to the considered operation or to all work order operations.

The Permits can be associated with WOs or with one or more of their Work Order Operations through: