NextGen FSM
2026 Wave Two 2026 Wave One 2025 Wave Two 2025 Wave Three
2026 Wave Two 2026 Wave One 2025 Wave Two 2025 Wave Three

Associate a Material with a Work Cycle row

Add materials, such as specific parts or tools, directly to individual operations within a Work Cycle. Make sure that the system prompts technicians to use or pick up the required materials for each part of the intervention.

Add material

  1. Navigate to Configuration > Core > Work Order Management > Work Cycles

  2. Enter one or more search criteria.

  3. Click Search.

  4. In the WO Type table, click the cycle type that you want to add material to.

  5. Click the three dots menu.

  6. Click Associate Materials.

  7. Click the Search icon in the Material field.

  8. In the List of allowed materials, select a material.

  9. Enter the amount of material that you need in the Quantity expected field.

  10. Click Insert.