To prevent burnout and maintain flexibility, ensure that resources don’t have a completely saturated schedule. Reserve time for non-routine or extra activities to limit how much operational resources can be automatically scheduled.
Search for saturation rules
To locate specific saturation rules:
-
Navigate to Configuration > Scheduling Optimization > Day Saturation > Day Saturation Rules.
-
As needed, enter:
-
Code.
-
Description.
-
Operations center.
-
Unavailability rules type.
-
Validity interval.
-
-
Click Search.
Create a new day saturation rule
To define a new rule for resource availability:
-
Navigate to Configuration > Scheduling Optimization > Day Saturation > Day Saturation Rules.
-
At the bottom, select New unavailability rule.
-
Enter a unique:
-
Code.
-
Description.
-
-
In the Unavailability rule type dropdown, select either:
-
Absolute.
-
Percentage.
-
-
In the Value field, enter minutes or percentages that the resource cannot work.
-
In the Validity interval field, enter:
-
From: The date you would like to start.
-
To: The date you would like to finish.
-
-
In the Operations center tab, select an operations center from the dropdown.
-
Click the Add + button.
-
Optional: Add more Operations centers if needed.
-
Note: To delete an operations center, in the List of operations centers table, click the Delete icon next to the operations center.
-
-
Click the Date tab.
-
Select a specific weekday or:
-
Public holiday.
-
Day before holiday.
-
Date.
-
-
Click Add.
-
Optional: Add more dates if needed.
-
Note: To delete a date, in the List of dates table, click the Delete icon next to the date.
-
-
To save the rule, click Insert.
Edit saturation rules
To update saturation rule parameters, locations, or dates:
-
Navigate to Configuration > Scheduling Optimization > Day Saturation > Day Saturation Rules.
-
From the List of unavailable scheduling rules table, click the row of the rule.
-
In the Edit unavailability rule tab, you can modify:
-
Code.
-
Description.
-
Unavailability rule type.
-
Value.
-
Validity interval.
-
Operations center.
-
Date.
-
-
Click Save.
Associate saturation rules
To assign a saturation rule to specific technicians or teams:
-
Navigate to Configuration > Scheduling Optimization > Day Saturation >.Associate Saturation Rules.
-
Optional: Either:
-
Select an operations center from the dropdown.
-
In the Rule description field, enter keywords.
-
-
Click Search.
-
In the Unavailable scheduling rules table, click a rule.
-
Click the Branch teams tab.
-
In the Work team table, click any teams the rule applies to.
-
Click Save.
Note: To apply different saturation levels to different groups within an operations center, add multiple rules.