NextGen FSM
2026 Wave Two 2026 Wave One 2025 Wave Two 2025 Wave Three
2026 Wave Two 2026 Wave One 2025 Wave Two 2025 Wave Three

Validate a field census

Audience: Dispatchers, managers

After a field technician submits census data and closes the work order (WO), a dispatcher must validate the submission before the official asset registry updates.

Prerequisites

Before you start, perform at least one census.

Follow the UI path

All following instructions start from this system path:

Features > Core > Asset Management > Search/Validate Registries

Validate a census

To find recent interventions:

  1. On the Search registries tab, enter at least one of these parameters:

    • WO code

    • Facility

    • Creation date interval (not exceeding a month)

  2. Click Search.

  3. In the Registry list, find a record with the status “To validate”.

  4. Click the Edit icon.

  5. Update the assessed facility status with one of these values:

    • Active

    • Under construction

    • Not active

    • Maintenance

  6. As needed, review and manually edit the specific asset features.

  7. Choose a validation outcome:

    • To approve: Click Save and validate.

      • The status upgrades to “Validated”.

    • To reject: Click Reject if the field values are incorrect.

      • The status downgrades to “Rejected”.

  8. Click Save.