NextGen FSM
2026 Wave Two 2026 Wave One 2025 Wave Two 2025 Wave Three
2026 Wave Two 2026 Wave One 2025 Wave Two 2025 Wave Three

Understand manual scheduling company parameters

To optimize manual scheduling in the daily plan for a specific project, activate advanced caching and precalculation logic or revert to legacy behaviors. These parameters allow administrators to toggle between high-performance batch processing and standard on-demand data retrieval.

List of manual scheduling enhancements

To view and modify these parameters:

  1. Navigate to Technical Settings > Company > Configuration.

  2. Customize parameters.

Customize parameters

To change how manual scheduling works, choose true or false on these parameters:

  • company.fsm.dailyplan.enablePreviewPanelOnPaste

    • To remove the hidden Preview panel, set to false.

    • To use the hidden Preview panel, set to true.

  • company.fsm.dailyplan.enableOssCachePrecalculation

    • To calculate times and distances between locations at the start of the assignment and upon cancellation, set to true.

      • Note: GISware stores the geographical data in a cache from a call.

    • To make individual calls as needed, set to false.

  • company.fsm.dailyplan.enableSchedulingEntitiesCachePrecalculation

    • To assign activities to the beginning of the operation and store data in a cache for reuse, set to true.

    • To retrieve data when needed, set to false.

  • company.fsm.dailyplan.enableSchedulingSingleValidationCheck

    • To perform checks on the work shift, set to true

      • It enables the “Lock scheduling days” rule and validates generic qualifications once at the beginning of the assignment.

    • To perform the checks during the assignment, set to false.