To optimize manual scheduling in the daily plan for a specific project, activate advanced caching and precalculation logic or revert to legacy behaviors. These parameters allow administrators to toggle between high-performance batch processing and standard on-demand data retrieval.
List of manual scheduling enhancements
To view and modify these parameters:
-
Navigate to Technical Settings > Company > Configuration.
-
Customize parameters.
Customize parameters
To change how manual scheduling works, choose true or false on these parameters:
-
company.fsm.dailyplan.enablePreviewPanelOnPaste-
To remove the hidden Preview panel, set to
false. -
To use the hidden Preview panel, set to
true.
-
-
company.fsm.dailyplan.enableOssCachePrecalculation-
To calculate times and distances between locations at the start of the assignment and upon cancellation, set to
true.-
Note: GISware stores the geographical data in a cache from a call.
-
-
To make individual calls as needed, set to
false.
-
-
company.fsm.dailyplan.enableSchedulingEntitiesCachePrecalculation-
To assign activities to the beginning of the operation and store data in a cache for reuse, set to
true. -
To retrieve data when needed, set to
false.
-
-
company.fsm.dailyplan.enableSchedulingSingleValidationCheck-
To perform checks on the work shift, set to
true.-
It enables the “Lock scheduling days” rule and validates generic qualifications once at the beginning of the assignment.
-
-
To perform the checks during the assignment, set to
false.
-