NextGen FSM

Understand manual scheduling company parameters

To optimize manual scheduling in the daily plan for a specific project, activate advanced caching and precalculation logic or revert to legacy behaviors. These parameters allow administrators to toggle between high-performance batch processing and standard on-demand data retrieval.

List of manual scheduling enhancements

To view and modify these parameters:

  1. Navigate to Technical Settings > Company > Configuration.

  2. Customize parameters.

Customize parameters

To change how manual scheduling works, choose true or false on these parameters:

  • company.fsm.dailyplan.enablePreviewPanelOnPaste

    • To remove the hidden Preview panel, set to false.

    • To use the hidden Preview panel, set to true.

  • company.fsm.dailyplan.enableOssCachePrecalculation

    • To calculate times and distances between locations at the start of the assignment and upon cancellation, set to true.

      • Note: GISware stores the geographical data in a cache from a call.

    • To make individual calls as needed, set to false.

  • company.fsm.dailyplan.enableSchedulingEntitiesCachePrecalculation

    • To assign activities to the beginning of the operation and store data in a cache for reuse, set to true.

    • To retrieve data when needed, set to false.

  • company.fsm.dailyplan.enableSchedulingSingleValidationCheck

    • To perform checks on the work shift, set to true

      • It enables the “Lock scheduling days” rule and validates generic qualifications once at the beginning of the assignment.

    • To perform the checks during the assignment, set to false.