To check the progress of a work order (WO), supervise field activities, validate technician debriefs, and manually correct technical and manpower data.
Search and monitor debriefs
To see a WO’s progress and what needs to happen:
-
Navigate to Features > Core > Analytics > Execution Monitor.
-
In the Configuration window, enter:
-
Operations center: The operations center (OC) to analyze.
-
WO types: The work order (WO) types to analyze.
-
Outcome cause type: The outcome cause types to analyze.
-
Outcome classes: The outcome classes to analyze.
-
Outcome causes: The outcome causes to analyze.
-
-
For the graph, enter:
-
Insert date: When the WOs were added.
-
Expected work end date: When WOs should be completed.
-
Scheduling date: When WOs were scheduled.
-
Outcome date: When the WO outcomes were supposed to be registered.
-
-
For the graph and report types, enter:
-
Bar disposition: Whether results are graphed as flanked or overlapped.
-
Grouping: How groups show on the graph.
-
Report type: The type of report the graph shows.
-
Grouping type: The type of WO group.
-
Analysis level: The graph’s level of system analysis.
-
-
Click Process diagram.
-
In the Accounting list, go to the Validation status column.
-
To see the "health" of the data, check the color of the dots:
-
Red: To be validated.
-
Black: In the validation process via FSM Mobile.
-
Light Blue: Automatically validated.
-
Green: Manually validated.
-
Validate interventions
To approve the technical data and the manpower effort reported by the field team, perform a batch validation:
-
In the Accounting list, select one or more rows.
-
In the header, click Options.
-
Choose the validation level:
-
Intervention validation: Validates both technical and manpower components.
-
Technical validation: Approves only the outcome, readings, and attachments.
-
Manpower validation: Approves only the labor hours and resource effort.
-
-
To finalize the order, click Close WO.
Edit and correct intervention outcomes
If there is an error, manually edit the debrief components:
-
Next to a specific record, click Options > Intervention Outcome.
-
In the Intervention outcome tab, verify:
-
Outcome cause.
-
Start time.
-
End time.
-
-
To add completed tasks that weren’t originally planned, click the Optional operation icon.
Understand outcome window data tabs
To learn more about the notifications and different components of a WO, click these tabs.
-
Notifications: Edit breakdown start/end times and causes if the WO is linked to a fault.
-
Measurements: View qualitative or quantitative data.
-
Note: A red dot indicates a missing mandatory measurement.
-
-
Used materials: To add serial or consumption items, click Materials accounting.
-
Resources summary: To edit "Use time", click Users Accounting.
-
To unlock and modify the manpower duration, click the Padlock icon.
-
-
Multimedia files: Review photos from the field or click Upload file to add a document from the server.
Manage manpower and resource accounting
To ensure labor hours are correctly entered for payroll and cost estimation:
-
Click Users accounting.
-
To modify their start and end times, click a resource’s row.
-
Edit details.
-
Click Save.
Add a missing resource
If a resource was present but not listed:
-
Click Users accounting > New.
-
Search for the resource's serial number.
-
Click Insert.