Fixed parameters - ASYSTEMSETTING

MAIN MENU → CONFIGURATION → CORE → FIXED DATA


Re-calibrate Type:

•Starting from the first activity (default): the updating and determination process of the predefined activities (PREFIX_ORDINATE) operates by taking into account the activities starting from the first planned and not yet executed/in charge according to the current scheduling (regardless of what the last accounted activity is).

•Starting from the last outcome: the updating and determination process of the predefined activities (PREFIX_ORDINATE) operates considering the activities starting from the first one planned and not yet executed/in charge after the last accounted activity

Thread Number Recalibrate: number of available threads to use in the recalibrate process;

Not removable Activities Number: number of activities to not remove from the single technician in the real time process;

Delta Time for not removable Activities (minutes): delta time to consider for not removable activities. It is considered in addition to ‘Not removable Activities Number’ parameter;

Delta Time Restart (minutes): in real time processing, the start of the day is set as the current time plus the delta indicated in this parameter. It allows the technician to have time to leave for the new schedule.

Delta Time max since last feedback (minutes): maximum delta time, within which the technician is taken into consideration in real time

Delta Time Work Day Begin (minutes): time interval to be considered for each technician work shift, in real time process. All resources with work shift beyond the set time interval are excluded during real time processing;

Last Info Actualization Mode: real time is performed as if the last synchronization took place now (CAUTION). Always and only within the same day and within the delta feedback (defined at the level of fixed data and at the level of the Operations Center). The residual time of the activity in charge is equal to the planned duration.

Maximum Attempt Number: number of attempts available for each scheduled Real Time execution (due to unexecuted final commit)

Thread Number: number of available threads to use in the Real Time process;

Max Activity for Thread: maximum number of activities to consider in each thread;

List AWOOID to monitor (sep. by commas): List of Work Order- Operation ID to trace in the VRP Log

Monitor all AWOOID: it allows to trace all Work Order- Operation Ids in the VRP Log

Max schedules on hold: define the maximum number of schedules on hold for the specific Scheduling Model;

Increase slot value for a team activity: it allows to increase the planned duration;

Maximum number of model schedules: Define the maximum number of possible scheduling for a given Scheduling Model; 

Maximum number of processing attempts: Maximum number of processing attempts for the single Scheduling Model;

Maximum activity duration: Maximum duration of schedulable activities extracted for scheduling

Lunchworking: Determine whether to enable or not the LunchWorking mode in the scheduling of activities. Lunch included in the scheduled activity

Maximum number of running scheduling: define the maximum number of ongoing scheduling;

Number of additional days for multi-day OC (ASSESCHEDULINGADDITIONALDAYS): Define the number of working days added to automatic scheduling to manage multi-day activities;