NextGen FSM
2026 Wave Two 2026 Wave Three 2026 Wave One
2026 Wave Two 2026 Wave Three 2026 Wave One

Manual Operativity/Actions Report

The manual actions report allows to display all the manual scheduling actions and unscheduling actions performed by a dispatcher on Virtual planning board or on Daily planning board.

MAIN MENU → FEATURES → CORE → DAILY AND MULTI-DAY PLAN → MANUAL WORKABILITY REPORT

Schermata 2023-02-01 alle 12.17.37.png


Figure - Manual Actions Report

The data domain considered by the Report is defined according the following filters to be set up: operation center, the operation dates (date in which is performed the scheduling/unscheduling action) and the scheduling dates (scheduling date of the planning board).

The output list (xls file) is composed by many work order’s properties, herein reported: Operation Center, Date Time Operation (date time in which has been performed the scheduling/unscheduling action), Operation Assignee User (user who has performed the scheduling/unscheduling action), plan type (virtal plan or real plan), Operation type (scheduling/unscheduling action), Scheduling Date (scheduling date related the assignment), Scheduling Resource (technician involved into the assignment), Order - Operation Code (work order and operation):

image-20210622-175337.png

Figure - Output List