Audience: Dispatchers and administrators
To ensure operational consistency and guarantee that complex jobs follow a standard technical path, define operations required for a given work order (WO) type. Include mandatory tasks, team sizes, and required documentation for every intervention and all critical steps when a task is completed.
Prerequisites
Before you start:
-
To learn more about work cycles, see Configure work cycles.
-
Ensure you have a WO type.
Follow the UI path
All following instructions start from this system path:
Configuration > Core > Work Order Management > Work Cycles
Search for a work cycle
To find a previously created work cycle:
-
Enter one or more search criteria.
-
Click Search.
Add a work cycle
To make a new work cycle:
-
On the Work cycles page, click + New.
-
Enter the following information:
-
WO type: Select the type of WO from the dropdown menu.
-
Cycle code: Enter the code of the cycle.
-
Cycle description: Enter a description of the cycle.
-
Order: Enter the desired order of the work cycle in the list.
-
Visible: Check the box if you want the work cycle to be visible and searchable.
-
WO to generate on mobile: Check this box if you want to be able to add this work cycle on mobile.
-
WO by order: Check the box if you want this WO to
-
Approval on field required: Check this box if the work cycle needs to be approved in the field.
-
-
Click Insert.
Add a work cycle row
To create a new step in a work cycle:
-
In the Work cycle table, click the cycle type that you want to add a row to.
-
Click the + New row button.
-
Enter the following information:
-
WO operation type
-
Operation number
-
Operation type
-
-
Click Insert.
What’s next
After creating a work cycle and adding a work cycle row, you can:
-
To define which materials are necessary to complete steps in the work cycle, see Associate materials with work cycle operations.
-
To add critical documents for work cycles, see Upload work cycle documents.
-
To upload a lot of work cycle data at once, see Mass import work cycles.
-
To connect work cycles with specific types of work orders, see Associate work cycles with work order types.
-
To add permits to work cycles, see Associate permits with work cycle operations.