NextGen FSM
2026 Wave Two 2026 Wave Three 2026 Wave One
2026 Wave Two 2026 Wave Three 2026 Wave One

Understand work order debriefs and outcomes

Review, edit, and validate field interventions before you send them to external systems. Ensure that technical and labor-related data is accurate and complete. If they want to handle the validation directly, dispatchers and planners can explicitly validate data from the search results table.

Understand validation components

An intervention breaks down into specific sub-components for validation. Interventions are only considered "fully validated" when all required components are approved:

  • Technical validation: When outcomes, time frames, readings, asset actions, attachments, and notes are approved.

  • Manpower validation: When labor time, including intervention time ranges and the total effort registered by resources are approved.

  • Optional components: When the system requires validation for materials used and vehicle schedules.

Understand validation status and visual indicators

To summarize progress, the system uses a color-coded status in the debriefing monitor and daily plan:

Color

Status

Meaning

Red

To validate

The intervention is ready for server-side or office review.

Black

To validate mobile

The field operator must perform an initial validation on their device.

Light blue

Automatically validated

The system automatically approves the data.

Green

Manually validated

An office user explicitly approves the data.

What’s next