NextGen FSM
2026 Wave Two 2026 Wave Three 2026 Wave One
2026 Wave Two 2026 Wave Three 2026 Wave One

Configure work cycles

Define the steps for each work order (WO) type. To standardize and clarify operations, add materials, documents, and work order types to individual operations within a work cycle. You can also import a large amount of work cycle information from an .xlsx  file.

What’s next