Ensure certain work cycles are included in specific work order types.
Prerequisites
Before you start, ensure you have at least one of both:
-
Work order type.
-
For more information about work order types, see Configure work order types.
-
Work cycle.
-
See Create work cycles.
-
Follow the UI path
All following instructions start from this system path:
Configuration > Core > Work Order Management > WO Types
Add work cycles to work order types
To connect work cycles with a specific type of work order:
-
In the Filters section, enter desired parameters.
-
Click Search.
-
In the Work order types table, click the desired WO type.
-
In the Work cycle rules list, click the + New button.
-
On the New rule tab, in the Work cycle dropdown menu, select the work cycle.
-
Click all applicable rule application parameters in these tables:
-
WO source list
-
Operations centers list
-
Meter locations list
-
Meter types list
-
-
Click Insert.
What’s next
-
To define which materials are necessary to complete steps in the work cycle, see Associate materials with work cycle operations.
-
To add documents to stages in a work cycle, see Associate documents with work cycle operations.