Audience: Administrators, dispatchers, and operations managers
Add work order (WO) permits that are needed for a particular part of a work cycle.
Prerequisites
Before you start:
-
To make permit types that authorize fieldwork, see Create permit types.
-
To make a permit that expires after an intervention, see Create a permit for a single intervention.
Follow the UI path
All following instructions start from this system path:
Configuration > Core > Work Order Management > Work Cycles
Add permit
-
On the Work cycles page, enter one or more search criteria.
-
For all fields, see Reference: Work cycles.
-
-
Click Search.
-
In the Work cycle table, click the WO type row to add material to.
-
On the Work cycle page, go to the Working cycle structure table.
-
Click the Three dots menu > Associate permits.
-
From the Available permissions type table, drag the permits you want to associate to the Associated permissions types table.
-
Click Save.
What’s next
-
To schedule WOs with valid permits, see Schedule work orders with permits.
-
To track and verify WO permits, see Manage work order permits.