NextGen FSM
2026 Wave Two 2026 Wave Three 2026 Wave One
2026 Wave Two 2026 Wave Three 2026 Wave One

Make work orders schedulable

Audience: Administrators and operations managers

To let technicians access them on the daily plan, you must make work orders (WOs) schedulable.

Prerequisites

Before you start, to create a WO, see either: 

Follow the UI path

All following instructions start from this system path:

Features > Core > Work order management > Search WO 

Enable WO scheduling

To allow WOs to be scheduled:

  1. Open a WO search. Search and perform mass actions on work orders|Search for WOs.

  2. Validate a WO.

Work cycle settings

The header and work cycle associated with the order, or the settings used to create the WO, is identified as:

  • Managed by operation: Specific operations determine the duration and cardinality.

    • Specific operations determine how the WO is scheduled and debriefed.

  • Managed by order: WO duration, team cardinality and residual WO duration usually defines the order.

    • The WO header determines how the WO is scheduled and debriefed.

What’s next