NextGen FSM
2026 Wave Two 2026 Wave Three 2026 Wave One
2026 Wave Two 2026 Wave Three 2026 Wave One

Associate materials with operations

Audience: Administrators and operations managers

Connect operations with the materials necessary to complete their tasks.

Prerequisites

Before you start:

Follow the UI path

All following instructions start from this system path:

Features > Core > Work Order Management > Search WO.

Approve materials

To approve materials for the specific WO type:

  1. In the Filters panel, go to the Status section.

  2. In the WO status dropdown, select Open.

  3. Click Search.

  4. In the WO list, click the desired WO code.

  5. At the bottom of the Work order page, Click the WO operations button.

  6. In the WO operations sequence tab, go to the WO operations sequence table.

  7. Next to the desired operation, click the Three dots menu > Associate materials.

  8. In the Enter new materials tab, enter:

    • Material

    • Quantity expected

  9. Click Insert > Ok.

Note: If the materials aren’t approved for the WO type related to the work cycle, the system returns a blocking error message. 

What’s next