NextGen FSM
2026 Wave Two 2026 Wave One 2025 Wave Two 2025 Wave Three
2026 Wave Two 2026 Wave One 2025 Wave Two 2025 Wave Three

Configure Work Order Operation Types

Overview

Work Order (WO) Operation types provide a unique definition of a given operation. You define a WO Operation type by specifying three key characteristics: the Operation type, the Resource type, and the Work center type.

Prepare Required Components

Before you create a WO Operation type, ensure that the following components already exist. If they don't, you need to create and define them.

Create a Work Order Operation Type

After the components are available, you combine them to define a unique WO Opertaion type. For detailed instructions, see Create a Work Order Operation Type.