The Activity Forecast feature allows you to simulate demand by configuring various types of tasks.
You can create forecasts based on either:
-
Real activities and operations already present in the system.
-
Simulated activities
A significant advantage of using activity forecasts is their complete independence from actual activities and work-orders data. This means any adjustments or edits made within the forecast simulation will not impact the live operational data in your system.
Before you start
-
Create the activity forecast
-
Learn how to add activities: Add activities
Add simulated timeframes
-
In the FSM App, navigate to FEATURES → FORECASTING & CAPACITY PLANNING → ACTIVITY FORECAST
-
Use the filter panel to search for existing forecast records
-
Clicking the option button related to the Activity Forecast, going on “Detail” option the configuration page will be showed as a gantt view.
-
Right-click on an activity row
-
OPTION 1: Click “Add Timeframe” to add a single timeframe using the form.
-
OPTION 2: Click “Add Multiple timeframes” to add more timeframes using the form.
Form - Add one timeframe
|
Field |
Description |
|---|---|
|
Start Date |
start date of the execution period |
|
End Date |
end date of the execution period |
|
Priority |
|
|
Grouping Constraint |
grouping constraint to associate to the activity, only one for each timeframe |
|
Mode |
mode to define the activity duration. It can be “Expected Duration” and “Number of tasks”. They are exclusive. |
|
Expected Duration (minutes) |
the total duration of the timeframe expressed in minutes.
|
|
Number of Tasks |
number of tasks to execute in the defined period |
|
Average Task Duration (minutes) |
average time of each task in the defined period |
|
The “Refresh” icon |
It allows to compute expected duration also when the selected Mode is “Number of Tasks”. It is not possibile the otherwise.
|
Form - Add multiple timeframes
|
Field |
Description |
|---|---|
|
Start Date |
start date of the execution period |
|
End Date |
end date of the execution period |
|
Every |
to define how often the timeframe starts |
|
Timeframe Duration (days) |
duration of each single timeframe expressed in days |
|
Priority |
|
|
Grouping Constraint |
grouping constraint to associate to the activity, only one for each timeframe |
|
Mode |
mode to define the activity duration. It can be “Expected Duration” and “Number of tasks”. They are exclusive. |
|
Expected Duration (minutes) |
the total duration of the timeframe expressed in minutes.
|
|
Number of Tasks |
number of tasks to execute in the defined period |
|
Average Task Duration (minutes) |
average time of each task in the defined period |
|
The “Refresh” icon |
It allows to compute expected duration also when the selected Mode is “Number of Tasks”. It is not possibile the otherwise.
|
The “Generate Preview” button allows to evaluate the result through a timeframe table, before to save it.
Edit a timeframe
To edit a timeframe already created, right-click on the timeframe and it will be possibile to edit or delete a timeframe.
The edit option will open the same creation panel, and it will be possibile to edit all parameters.
A tooltip on each timeframe will show some information about it:
-
Start Date
-
End Date
-
Expected Duration (minutes)