Gap Filling Scheduling: Managed Features and Limitations
The Gap Filling Scheduling logic operates based on a specific subset of FSM features. Below is the breakdown of what is currently supported and what is excluded during the scheduling phase.
Supported Features
When calculating availability, the scheduling engine takes the following into account:
-
Fixed teams and Crew shells
-
Unavailability
-
Mandatory and excluded resources
-
Preferred resources
-
WO permit
-
Scheduling zones (Geographic constraints)
-
On-duty availability
-
Day occupation rules
-
Lock scheduling days rules
-
Resource work schedule types
-
Multistage
-
Resources in mixed teams in daily plan: These resources are integrated only with single activities
Non-Managed Features and Limitations
The following features and rules are not managed within this specific scheduling logic:
-
Formations
-
Team integration: team are not integrated with single-resource activities
-
Day saturation rules
-
Contractors management and Container resources management
-
Lock/Unlock day options in Virtual Plan
-
Bundler, manual execution is not allowed for bundler
-
Optimize & Integrate route does not include activities already scheduled in the Daily Plan, even if they are unscheduled in the virtual plan.
-
Gap Filling execution is constrained to starting from the next calendar day (it doesn’t work on today).