NextGen FSM
2026 Wave Two 2026 Wave Three 2026 Wave One
2026 Wave Two 2026 Wave Three 2026 Wave One

Filter work orders for the Job Bundler

The work order filter allows you to select a subset of schedulable operations for bundling.

  • Product: NextGen FSM Platform

  • UI Location: Configuration > Job Bundler > WO Filters.

From the WO Filters page, you can create, edit, and search for Work Order Filters used by the Job Bundler.

What’s next

  • See Work Order Filters in Working with Scheduling Optimization section.